2015 Mayoral manifesto: Transportation

Preliminaries

Please note that I have called this part of my manifesto “Transportation” and not “Traffic”. I agree that traffic sucks and that the Mayoral candidates ought to have some ideas for how to deal with it. It’s my opinion that the best answers involve providing as many viable alternatives to getting into the car and contributing to the problem as possible. I believe a lot of progress on this has been made under Mayor Parker, but there’s a lot of unfinished business, a lot of business that’s just getting started, and a lot of business that hasn’t started or may not even be on the drawing board yet, but needs to be. I’ve got a lot of ground to cover, so let’s get started.

Metro

The reclamation and revitalization of Metro has been one of Mayor Parker’s greatest successes. That agency was a dumpster fire when she took office – I had no idea how far off track it had gotten. It was Mayor Parker’s appointment of a stellar Metro Board and their subsequent tabbing of George Greanias as CEO/general fix-it man that started the salvation process and got us to where we are now, on the cusp of the last two rail lines opening, the bus reimagining, the marginal sales tax revenue collection, and the generally restored trust in the agency by stakeholders and the public. All Mayors get to appoint their own Metro boards. It should be a priority for all of the Mayoral candidates to ensure they appoint a Board as good as this one has been, and to build on the good work they have done.

Rail

As noted, by the time the next Mayor is inaugurated, all of the current Metro rail construction (with the exception of the Harrisburg line overpass and extension) will be done. With the Universities line in limbo, you’d think that might be the end of rail construction for the foreseeable future, but that’s far from the case. The Uptown BRT line is expected to be operational by mid-2017. There are three commuter rail lines under discussion, one of which – the US90A Southwest Rail Corridor (SWRC) line – was included in the 2003 Metro referendum and which was moving forward as recently as 2012 before being put on hold while the other lines were being finished. Another proposed commuter rail line, along the 290 corridor, would connect to the Uptown BRT line and might wind up sharing space, if not tracks, with the proposed Houston to Dallas high-speed rail line. That privately-financed venture, which is undergoing environmental review and discussion with potentially affected communities, is still seeking a terminus in Houston, and while downtown is preferred it presents some big challenges. One possible solution to that might be to have it end at the Northwest Transit Center, and connect to a light rail line that would need to be built and which could be shared with that 290 corridor commuter line. It’s hard to know how much of this might happen – very little is set in stone, and much could change, or could just not come about – but the potential is there for a lot more rail to be built, and while the Mayor would not be directly involved in any of this, it’s fair to say that he could have an impact on the outcome if he wanted to. For that matter, who’s to say that the Universities line couldn’t move forward someday? I want a Mayor that’s willing and able to advocate for and abet these projects.

Bicycles

As has been noted several times, Houston is a much more bike-friendly city now than it was a few years ago. We have a growing bike share program, an extensive and also growing network of off-road bike trails, a pioneer dedicated on-road bike lane downtown to help connect one trail to another, a local safe passing ordinance with a more comprehensive plan for bike safety in the works, and we have tweaked parking requirement regulations to enable bike parking. But as with rail, with all that progress there is much to be done. Most of the bike trail work has yet to be done; for the work that has been enabled by the passage of a bill making CenterPoint rights of way available as bike paths, it’s still in the conceptual stage. B-Cycle has been a big success but some kiosks are more successful than others, and it’s all still within biking distance of downtown. Moving it farther out, and integrating it more tightly with existing and future transit should be on the to do list. And of course, better connecting people to the present and future bike infrastructure, perhaps via Neighborhood Greenways or something similar, needs to be on it as well. More people on bikes means fewer people in cars. Surely that will help ease traffic woes a bit.

Pedestrians and sidewalks

Again, there is progress here, with Complete Streets and a focus on making residential streets more residential. But Houston is a dangerous place to walk, and a lot of streets have no sidewalks or essentially useless sidewalks. Improving the pedestrian experience is key to making transit more attractive. Improving pedestrian safety may require lowering speed limits. What do our Mayoral hopefuls think about these things?

Roads

So, um, what’s going on with ReBuild Houston? It would be nice to get some clear direction, and a lot more regular information, on that. Beyond that, all I really care about is keeping an eye on TxDOT and making sure they don’t do anything too destructive to existing infrastructure and neighborhoods in their quest to do something with I-45. The next Mayor needs to stay on top of that and do whatever it takes to prevent anything bad from happening.

That’s my view of transportation issues. What would you add to this list?

Related Posts:

This entry was posted in Election 2015 and tagged , , , , , , , , , , , , , , , , , , , , , . Bookmark the permalink.

One Response to 2015 Mayoral manifesto: Transportation

  1. PDiddie says:

    Good stuff. Good conversation starters, good questions for debates and town hall fora.

Comments are closed.